Gyutai Kim

Chosun University - Department of Industrial Engineering

3215 The 2nd Building of College of Engineering

375 Seosuk-Dong, Dong-Gu

Kwangju 501-759

Korea, Republic of (South Korea)

SCHOLARLY PAPERS

2

DOWNLOADS

143

SSRN CITATIONS

0

CROSSREF CITATIONS

0

Scholarly Papers (2)

1.

An Opportunity Cost Model to Value a Deferral Option

Number of pages: 32 Posted: 01 Aug 2012
Gyutai Kim and Luke.T. Miller
Chosun University - Department of Industrial Engineering and Fort Lewis College
Downloads 80 (555,637)

Abstract:

Loading...

binomial lattice model, capital budgeting, decision making/process, opportunity cost, real options

2.

Looking at the Value of an One-Step Deferral Option Through the Opportunity Cost Concept

Number of pages: 27 Posted: 08 Sep 2008
Gyutai Kim
Chosun University - Department of Industrial Engineering
Downloads 63 (632,749)

Abstract:

Loading...