M. S. Prabhuswamy

Sri Jayachamarajendra College of Engineering

Professor, Department of Mechanical Engineering

Mysore, Karnataka 570023

India

SCHOLARLY PAPERS

3

DOWNLOADS

0

SSRN CITATIONS

0

CROSSREF CITATIONS

0

Scholarly Papers (3)

1.

Implementation of Kaizen Techniques in TPM

The IUP Journal of Mechanical Engineering, Vol. VI, No. 3, August 2013, pp. 38-54
Posted: 28 Dec 2013
K. P. Ravikumar, M. S. Prabhuswamy and P. Nagesh
Malnad College of Engineering, Sri Jayachamarajendra College of Engineering and Sri Jayachamarajendra College of Engineering

Abstract:

Loading...

Kaizen, Muda, Fuguai, OEE, Zero breakdowns

2.

Statistical Analysis and Reliability Estimation of Total Productive Maintenance

The IUP Journal of Operations Management, Vol. XII, No. 1, February 2013, pp. 7-20
Posted: 08 Apr 2013
M. S. Prabhuswamy, P. Nagesh and K. P. Ravikumar
Sri Jayachamarajendra College of Engineering, Sri Jayachamarajendra College of Engineering and Malnad College of Engineering

Abstract:

Loading...

3.

Implementation of TQM Techniques in TPM

The IUP Journal of Science & Technology, Vol. 7, No. 2, pp. 55-70, June 2011
Posted: 06 Apr 2012
P. Nagesh, K. P. Ravikumar and M. S. Prabhuswamy
Sri Jayachamarajendra College of Engineering, Malnad College of Engineering and Sri Jayachamarajendra College of Engineering

Abstract:

Loading...

total productive maintenance (TPM), total quality management (TQM), autonomous maintenance, productive maintenance