|
||||
|
||||
Dynamic Investment in Extraction Capacity of Exhaustible ResourcesHamed GhoddusiVienna Graduate School of Finance (VGSF) June 12, 2010 Scottish Journal of Political Economy, Forthcoming Abstract: This paper studies a resource extraction problem with capacity constraints, expansion options and stochastic demand process. The producer has to decide on the optimal rate of extraction and the optimal time to build further capacity simultaneously. Using numerical methods to solve the problem, it is shown that previous results which suggest that extraction capacity should be built at the beginning, are not necessarily true under uncertainty. I derive equations for the optimal time to build extra capacity. The results of this paper can contribute to better understanding of long-run energy and commodity supply.
Number of Pages in PDF File: 20 Keywords: Capacity Expansion Options, Hotelling Role, Investment Under Uncertainty JEL Classification: Q31, G13 Accepted Paper SeriesDate posted: June 12, 2010Suggested CitationContact Information
|
|
|||||||||||||||
© 2013 Social Science Electronic Publishing, Inc. All Rights Reserved.
FAQ
Terms of Use
Privacy Policy
Copyright
This page was processed by apollo4 in 0.359 seconds