Chee-Chong Teo

Nanyang Technological University (NTU)

N1 01-A09 Nanyang Avenue

Singapore 639798

Singapore

SCHOLARLY PAPERS

2

DOWNLOADS
Rank 48,041

SSRN RANKINGS

Top 48,041

in Total Papers Downloads

670

CITATIONS

1

Scholarly Papers (2)

1.

Implementing Supply Routing Optimization in a Make-to-Order Manufacturing Network

MIT Sloan Research Paper No. 4708-08
Number of pages: 42 Posted: 07 Aug 2008
Massachusetts Institute of Technology (MIT) - Operations Research Center, London Business School, Dell Inc., Dell Inc., Nanyang Technological University, Nanyang Technological University (NTU) and École Nationale Supérieure des Mines de Paris
Downloads 616 (31,400)
Citation 1

Abstract:

Dell, supply chain, make-to-order manufacturing

2.

Optimality Properties of Speed Optimization for a Vessel Operating with Time Window Constraint

Journal of the Operational Research Society, Vol. 66, Issue 4, pp. 637-646, 2015
Number of pages: 10 Posted: 12 Mar 2015
Zhibin Zhang, Chee-Chong Teo and Xiaoyu Wang
Nanyang Technological University (NTU), Nanyang Technological University (NTU) and Nanyang Technological University (NTU)
Downloads 0 (554,999)
  • Add to Cart

Abstract: