Clemens Gerbaulet

German Institute for Economic Research (DIW Berlin)

Mohrenstraße 58

Berlin, 10117

Germany

SCHOLARLY PAPERS

6

DOWNLOADS

281

SSRN CITATIONS

3

CROSSREF CITATIONS

2

Scholarly Papers (6)

1.

New Cross-Border Electricity Balancing Arrangements in Europe

DIW Berlin Discussion Paper No. 1400
Number of pages: 27 Posted: 30 Jul 2014
Casimir Lorenz and Clemens Gerbaulet
TU Berlin - Workgroup for Infrastructure Policy (WIP) and German Institute for Economic Research (DIW Berlin)
Downloads 75 (345,127)
Citation 2

Abstract:

Loading...

balancing energy markets, regional cooperation, network code electricity balancing

2.

Combining Energy Networks: The Impact of Europe's Natural Gas Network on Electricity Markets Until 2050

DIW Berlin Discussion Paper No. 1317
Number of pages: 27 Posted: 30 Jul 2013 Last Revised: 19 Sep 2013
ETH Zürich - Centre for Energy Policy and Economics (CEPE), German Institute for Economic Research (DIW Berlin), German Institute for Economic Research (DIW Berlin), TU Berlin - Workgroup for Infrastructure Policy (WIP) and WWZ, Wirtschaftswissenschaftliche Fakultät der Universität Basel
Downloads 69 (361,379)
Citation 5

Abstract:

Loading...

Europe, electricity markets, natural gas markets, networks

3.

Wind Providing Balancing Reserves: An Application to the German Electricity System of 2025

DIW Berlin Discussion Paper No. 1655
Number of pages: 41 Posted: 14 Apr 2017
Casimir Lorenz and Clemens Gerbaulet
TU Berlin - Workgroup for Infrastructure Policy (WIP) and German Institute for Economic Research (DIW Berlin)
Downloads 36 (479,342)
Citation 1

Abstract:

Loading...

Balancing reserves, electricity sector modeling, power plant dispatch, wind participation

4.

European Electricity Grid Infrastructure Expansion in a 2050 Context

DIW Berlin Discussion Paper No. 1299
Number of pages: 21 Posted: 24 May 2013
Jonas Egerer, Clemens Gerbaulet and Casimir Lorenz
German Institute for Economic Research (DIW Berlin) - Department of International Economics, German Institute for Economic Research (DIW Berlin) and TU Berlin - Workgroup for Infrastructure Policy (WIP)
Downloads 35 (483,913)
Citation 2

Abstract:

Loading...

Electricity, European Transmission Network, Investment Model

5.

Power System Impacts of Electric Vehicles in Germany: Charging with Coal or Renewables?

DIW Berlin Discussion Paper No. 1442
Number of pages: 33 Posted: 22 Jan 2015
Wolf-Peter Schill and Clemens Gerbaulet
German Institute for Economic Research (DIW Berlin) and German Institute for Economic Research (DIW Berlin)
Downloads 33 (493,379)
Citation 2

Abstract:

Loading...

Electric vehicles, power system, dispatch model, renewable energy

6.

Is There Still a Case for Merchant Interconnectors? Insights from an Analysis of Welfare and Distributional Aspects of Options for Network Expansion in the Baltic Sea Region

DIW Berlin Discussion Paper No. 1404
Number of pages: 33 Posted: 27 Aug 2014
Clemens Gerbaulet and Alexander Weber
German Institute for Economic Research (DIW Berlin) and Technische Universität Berlin (TU Berlin)
Downloads 33 (493,379)
Citation 1

Abstract:

Loading...

Merchant, regulated, transmission expansion, MPEC