Marie Schmidt

Erasmus Research Institute of Management (ERIM)

P.O. Box 1738

3000 DR Rotterdam

Netherlands

SCHOLARLY PAPERS

9

DOWNLOADS
Rank 33,241

SSRN RANKINGS

Top 33,241

in Total Papers Downloads

1,698

SSRN CITATIONS
Rank 36,356

SSRN RANKINGS

Top 36,356

in Total Papers Citations

17

CROSSREF CITATIONS

4

Scholarly Papers (9)

1.

Optimization Approaches for the Traveling Salesman Problem with Drone

ERIM Report Series Reference No. ERS-2015-011-LIS
Number of pages: 40 Posted: 04 Aug 2015
Niels Agatz, Paul Bouman and Marie Schmidt
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM), Erasmus Research Institute of Management (ERIM) and Erasmus Research Institute of Management (ERIM)
Downloads 1,198 (20,307)
Citation 24

Abstract:

Loading...

traveling salesman problem, vehicle routing, drones, home delivery

2.

Dynamic Programming Approaches for the Traveling Salesman Problem with Drone

Number of pages: 24 Posted: 13 Sep 2017 Last Revised: 06 Jun 2018
Paul Bouman, Niels Agatz and Marie Schmidt
Erasmus Research Institute of Management (ERIM), Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM) and Erasmus Research Institute of Management (ERIM)
Downloads 278 (130,791)
Citation 12

Abstract:

Loading...

Traveling salesman problem, Vehicle routing, Drones, Dynamic Programming

3.

The Line Planning Routing Game

ERIM Report Series Reference No. ERS-2014-017-LIS
Number of pages: 30 Posted: 23 Jan 2015
University of Goettingen (Gottingen), University of Goettingen (Gottingen) and Erasmus Research Institute of Management (ERIM)
Downloads 58 (425,318)

Abstract:

Loading...

Transportation, Game Theory, Routing, Line Planning, Routing Game

4.

Maintenance Appointments in Railway Rolling Stock Rescheduling

Number of pages: 31 Posted: 09 Jan 2016 Last Revised: 12 Jan 2016
Joris Wagenaar, Leo Kroon and Marie Schmidt
Erasmus University Rotterdam (EUR), Erasmus Research Institute of Management (ERIM) and Erasmus Research Institute of Management (ERIM)
Downloads 43 (483,673)
Citation 3

Abstract:

Loading...

railway rolling stock rescheduling, RSRP, maintenance problems

5.

Resolving Infeasibilities in Railway Timetabling Instances

Number of pages: 29 Posted: 23 Jan 2018
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM), Erasmus Research Institute of Management (ERIM), Eindhoven University of Technology (TUE), Erasmus Research Institute of Management (ERIM) and Pontifical Catholic University of Rio de Janeiro (PUC-Rio)
Downloads 36 (515,498)

Abstract:

Loading...

railway timetabling

6.

A Good or a Bad Timetable: Do Different Evaluation Functions Agree?

ERIM Report Series
Number of pages: 42 Posted: 10 Apr 2019
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM), Erasmus Research Institute of Management (ERIM), University of Stuttgart and Erasmus University Rotterdam (EUR) - Department of Econometrics
Downloads 28 (557,973)
Citation 3

Abstract:

Loading...

public transport evaluation, consistent evaluation, timetable evaluation, comparison of evaluation functions

7.

Railway Timetabling With Integrated Passenger Distribution

Number of pages: 46 Posted: 17 Dec 2019
Johann Hartleb and Marie Schmidt
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM) and Erasmus Research Institute of Management (ERIM)
Downloads 27 (563,840)
Citation 3

Abstract:

Loading...

transportation, timetabling, public transport, route choice, discrete choice model, passenger distribution

8.

Timetabling for Strategic Passenger Railway Planning

ERIM Report Series Reference Forthcoming
Number of pages: 39 Posted: 30 Jan 2020
Gert-Jaap Polinder, Marie Schmidt and Dennis Huisman
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM), Erasmus Research Institute of Management (ERIM) and Erasmus University Rotterdam (EUR) - Department of Econometrics
Downloads 18 (622,548)
Citation 2

Abstract:

Loading...

public transportation planning, strategic timetabling, integration of timetabling and passenger routing

9.

An Iterative Heuristic for Passenger-Centric Train Timetabling with Integrated Adaption Times

Number of pages: 49 Posted: 22 Jun 2020
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM), University of Bologna, Erasmus Research Institute of Management (ERIM) and Erasmus University Rotterdam (EUR) - Department of Econometrics
Downloads 12 (665,324)

Abstract:

Loading...

public transportation planning, heuristic, integration of timetabling and passenger routing, adaption time