default author photo

Wei (Mike) Li

University of Kentucky

Assistant Professor

Lexington, KY 40506

United States

SCHOLARLY PAPERS

5

DOWNLOADS

151

TOTAL CITATIONS

0

Scholarly Papers (5)

1.

Operating Room Scheduling and Adaptive Control Using a Priority First Fit Decreasing Heuristic

Engineering Management Research, Vol. 4(2), p. 46-53, November 2015
Number of pages: 9 Posted: 22 Sep 2016
University of Kentucky, University of Calgary - Department of Economics, University of Calgary - Haskayne School of Business and Alberta Health Services - Foothills Medical Centre
Downloads 58 (989,921)

Abstract:

Loading...

Operating Room Scheduling, Bin Packing, Heuristic, Flow Shop

2.

An Efficient Heuristic for Adaptive Production Scheduling and Control in One-of-a-Kind Production

Computers and OR, 38, (2011), 267-276
Number of pages: 28 Posted: 28 Aug 2016
University of Kentucky, University of Calgary - Haskayne School of Business, University of Calgary and University of Calgary
Downloads 50 (1,063,489)

Abstract:

Loading...

Flow shop scheduling, Adaptive production control, Petri nets, Simulation

3.

Trade-Off Balancing in One-Stage Production with Variation in Processing Times

Number of pages: 27 Posted: 31 Dec 2023
Wei (Mike) Li and Barrie R. Nault
University of Kentucky and University of Calgary - Haskayne School of Business
Downloads 43 (1,157,785)

Abstract:

Loading...

Production control, scheduling, stochastic processing times

4.

Trade-off Balancing Between Maximum and Total Completion Times for No-Wait Flow Shop Production

International Journal of Production Research. In press (published online), 1-17, June 2019, DOI: 10.1080/00207543.2019.1630777
Posted: 27 May 2020
Honghan Ye, Wei (Mike) Li and Barrie R. Nault
affiliation not provided to SSRN, University of Kentucky and University of Calgary - Haskayne School of Business

Abstract:

Loading...

Scheduling, No-Wait Flow Shop, Trade-Off Balancing, Maximum Completion Time, Total Completion Time

5.

An Effective and Efficient Heuristic for N-Wait Flow Shop Production to Minimize Total Completion Time

Computers & Industrial Engineering, 108, June 2017, 57-69.
Posted: 27 May 2020
Honghan Ye, Wei (Mike) Li and Barrie R. Nault
affiliation not provided to SSRN, University of Kentucky and University of Calgary - Haskayne School of Business

Abstract:

Loading...

computational complexity, heuristics, no-wait flow shop, total completion time.