L. G. Kroon

Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management

Professor of Quantative Logistics

RSM Erasmus University

PO Box 1738

3000 DR Rotterdam

Netherlands

http://web.eur.nl/fbk/dep/dep1/Introduction/Staff/People/Kroon

Erasmus Research Institute of Management (ERIM)

P.O. Box 1738

3000 DR Rotterdam

Netherlands

NS Reizigers - Department of Logistics

3500 HA Utrecht

Netherlands

SCHOLARLY PAPERS

19

DOWNLOADS
Rank 14,173

SSRN RANKINGS

Top 14,173

in Total Papers Downloads

3,347

CITATIONS
Rank 26,837

SSRN RANKINGS

Top 26,837

in Total Papers Citations

22

Scholarly Papers (19)

1.

Operations Research in Passenger Railway Transportation

ERIM Report Series Reference No. ERS-2005-023-LIS
Number of pages: 35 Posted: 13 Sep 2005
Erasmus University Rotterdam (EUR) - Department of Econometrics, Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management, Erasmus University Rotterdam (EUR) - Erasmus Center for Optimization in Public Transport (ECOPT) and Erasmus University Rotterdam (EUR)
Downloads 588 (44,818)

Abstract:

Loading...

operations research, passenger railway transportation, planning

2.

Reliability and Heterogeneity of Railway Services

ERIM Report Series Reference No. ERS-2003-090-LIS
Number of pages: 29 Posted: 11 Mar 2004
Erasmus University Rotterdam (EUR), Econometric Institute and Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management
Downloads 291 (103,618)

Abstract:

Loading...

railways, transportation, reliability, heterogeneity, simulation

3.

Applying Operations Research Techniques to Planning of Train Shunting

ERIM Report Series Reference No. ERS-2003-094-LIS
Number of pages: 25 Posted: 09 Mar 2004
Erasmus University Rotterdam (EUR) - Erasmus Center for Optimization in Public Transport (ECOPT), NS Reizigers - Department of Logistics, Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and NS Reizigers - Department of Logistics
Downloads 276 (109,658)

Abstract:

Loading...

railway optimization, A* search, real world application, routing

4.

Mathematical Models for Planning Support

ERIM Report Series Reference No. ERS-2003-032-LIS
Number of pages: 31 Posted: 30 May 2003
L. G. Kroon and Rob Zuidwijk
Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM)
Downloads 247 (123,020)

Abstract:

Loading...

Planning, planning support, mathematical models, optimization, modeling process

5.

Shunting of Passenger Train Units in a Railway Station

ERIM Report Series Reference No. ERS-2002-74-LIS
Number of pages: 23 Posted: 17 Feb 2003
Erasmus Universiteit Rotterdam, ECOPT & ERIM (Deceased), Erasmus University Rotterdam (EUR) - Erasmus Center for Optimization in Public Transport (ECOPT), Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and Erasmus University Rotterdam (EUR) - Department of Econometrics
Downloads 241 (126,174)

Abstract:

Loading...

railway optimization, column generation, real world application, logistics

6.

Cyclic Railway Timetabling: A Stochastic Optimization Approach

ERIM Report Series Reference No. ERS-2005-051-LIS
Number of pages: 32 Posted: 25 Oct 2005
Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management, Econometric Institute and Erasmus University Rotterdam (EUR)
Downloads 223 (136,182)

Abstract:

Loading...

railway transportation, stochastic optimization, punctuality, buffer times, cyclic timetables

7.

Reinventing Crew Scheduling at Netherlands Railways

ERIM Report Series Reference No. ERS-2004-046-LIS
Number of pages: 23 Posted: 24 Sep 2004
NS Reizigers - Department of Logistics, University of Padova - DEI, Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management, ORTEC International and Erasmus University Rotterdam (EUR)
Downloads 215 (141,057)

Abstract:

Loading...

efficiency, crew scheduling, set covering model, punctuality and crew, Railway transportation

8.

Allocation of Railway Rolling Stock for Passenger Trains

ERIM Report Series Reference No. ERS-2002-47-LIS
Number of pages: 20 Posted: 18 Feb 2003
NS Reizigers - Department of Logistics, Cap Gemini Ernst & Young, Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and University of California, San Francisco (UCSF)
Downloads 203 (148,862)

Abstract:

Loading...

operations research, transportation, railways, capacity allocation, rolling stock

9.

Efficient Circulation of Railway Rolling Stock

ERIM Report Series Reference No. ERS-2002-110-LIS
Number of pages: 23 Posted: 18 Feb 2003
Polytechnic University of Turin - Department of Production Systems and Business Economics (DISPEA), ORTEC Consultants, Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and Centrum voor Wiskunde en Informatica (CWI)
Downloads 191 (157,550)
Citation 3

Abstract:

Loading...

railways, public transportation, rolling stock circulation, operations research, logistics

10.

Crew Scheduling for Netherlands Railways: "Destination: Customer"

ERIM Report Series Reference No. ERS-2000-56-LIS
Number of pages: 22 Posted: 10 Feb 2003
L. G. Kroon and Matteo Fischetti
Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and University of Padova - DEI
Downloads 151 (193,415)

Abstract:

Loading...

railways, crew scheduling, set covering model, lagrange relaxation, dynamic column generation

11.

A Railway Timetable Rescheduling Approach for Handling Large Scale Disruptions

ERIM Report Series Reference No. ERS-2014-010-LIS
Number of pages: 24 Posted: 28 Jul 2014
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM), University of Bologna, University of Bologna, Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and University of Bologna
Downloads 147 (197,644)
Citation 1

Abstract:

Loading...

12.

Stochastic Improvement of Cyclic Railway Timetables

ERIM Report Series Reference No. ERS-2006-067-LIS
Number of pages: 30 Posted: 16 Jan 2007
Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management, Econometric Institute, Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM), Erasmus University Rotterdam (EUR) and Erasmus University Rotterdam (EUR)
Downloads 127 (222,109)

Abstract:

Loading...

Railway Timetabling, Stochastic Optimization, Robustness

13.

Shunting of Passenger Train Units: An Integrated Approach

ERIM Report Series Reference No. ERS-2006-068-LIS
Number of pages: 36 Posted: 16 Jan 2007
L. G. Kroon, R.M. Lentink and L. Schrijver
Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management, Erasmus University Rotterdam (EUR) - Erasmus Center for Optimization in Public Transport (ECOPT) and affiliation not provided to SSRN
Downloads 86 (290,533)

Abstract:

Loading...

Optimization, Passenger Railways, Shunting

14.

Shuttle Planning for Link Closures in Urban Public Transport Networks

ERIM Report Series Reference No. ERS-2014-011 LIS
Number of pages: 31 Posted: 29 Aug 2014
Erasmus Research Institute of Management (ERIM), Massachusetts Institute of Technology (MIT) - Department of Civil and Environmental Engineering, Massachusetts Institute of Technology (MIT) - Department of Civil and Environmental Engineering, Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM)
Downloads 85 (292,650)

Abstract:

Loading...

15.

Integer Constraints for Train Series Connections

ERIM Report Series Reference No. ERS-2000-05-LIS
Number of pages: 16 Posted: 03 Feb 2003
Rob Zuidwijk and L. G. Kroon
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM) and Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management
Downloads 76 (312,851)

Abstract:

Loading...

train series connection, cyclic timetable, railway scheduling, MILP constraint, periodic set

16.

Maintenance in Railway Rolling Stock Rescheduling for Passenger Railways

ERIM Report Series Reference No. ERS-2015-002-LIS
Number of pages: 38 Posted: 18 Feb 2015
Joris Wagenaar and L. G. Kroon
Erasmus University Rotterdam (EUR) and Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management
Downloads 62 (349,134)

Abstract:

Loading...

17.

Flexible Connections in Pesp Models for Cyclic Passenger Railway Timetabling

ERIM Report Series Reference No. ERS-2012-008-LIS
Number of pages: 36 Posted: 26 Jul 2012
Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management, affiliation not provided to SSRN, Erasmus University Rotterdam (EUR) and Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM)
Downloads 58 (360,784)

Abstract:

Loading...

cyclic railway timetabling, PESP, rolling stock and passenger connections

18.

Circulation of Railway Rolling Stock: A Branch-and-Price Approach

ERIM Report Series Reference No. ERS-2003-055-LIS
Number of pages: 32 Posted: 09 Dec 2009
Marc Peeters and L. G. Kroon
Electrabel and Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management
Downloads 53 (376,502)

Abstract:

Loading...

railways, public transportation, rolling stock circulation, operations research, logistics

19.

Opsporen Van Sneller Naar Beter; Modelling Through

ERIM Report Series Reference No. EIA-2001-003-LIS
Number of pages: 48 Posted: 28 Feb 2008
L. G. Kroon
Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management
Downloads 27 (480,002)

Abstract:

Loading...