Sem Sælands vei 11
Trondheim, NO-7034
Norway
Waste to energy, Post-combustion CO2 capture, Combined Heat and Power, Interim Solvent storage
Polygeneration system, gasification, Global optimization, Co2 capture, Waste Tire, natural gas