France
CESI LINEACT
Hub location problem, Capacitated hubs, Capacitated links, Multiple allocation, Incomplete inter-hub network, Direct links
Hub location problemCapacitated hubsCapacitated linksMultiple allocation Incomplete inter-hub networkDirect link
Multi-objective optimization, Human-Robot Collaboration, Working difficulty level, Flexible manufacturing systems, Flexible job-shop problem, Mixed integer linear programming
JSSPT, Dynamic Scheduling, Human-Robot Interaction, Game theory, MRTA, Agent-Based Modeling, Simulation, AIV, Industry 5.0
Autonomous and intelligent vehicles, job shop scheduling problem, Simulation, Multi-agent system, Human behaviour modelling, Markov chain, Industry 5.0.
Flexible manufacturing system, Flexible job shop scheduling, Ant colony optimisation, Metaheuristics, Integrated scheduling
Short-term load forecasting, Artificial neural networks, Multi-objective optimization, Weight initialization, TOPSIS
Human-Robot Collaboration, Digital Twin, Industry 5.0, Human Factors
JSSPT, Sustainable Manufacturing, Time-of-Use tariffs, Human-Robot Interactions, Multi-Agent Simulation, Multi-Objective Optimization