Gabor Maroti

Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM)

P.O. Box 1738

Room T08-21

3000 DR Rotterdam, 3000 DR

Netherlands

SCHOLARLY PAPERS

3

DOWNLOADS

247

CITATIONS

2

Scholarly Papers (3)

1.

Stochastic Improvement of Cyclic Railway Timetables

ERIM Report Series Reference No. ERS-2006-067-LIS
Number of pages: 30 Posted: 16 Jan 2007
Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management, Erasmus University, Rotterdam (EUR) - Erasmus School of Economics, Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM), Erasmus University Rotterdam (EUR) and Erasmus University Rotterdam (EUR)
Downloads 120 (196,891)
Citation 1

Abstract:

Railway Timetabling, Stochastic Optimization, Robustness

2.

Shuttle Planning for Link Closures in Urban Public Transport Networks

ERIM Report Series Reference No. ERS-2014-011 LIS
Number of pages: 31 Posted: 29 Aug 2014
Erasmus Research Institute of Management (ERIM), Massachusetts Institute of Technology (MIT) - Department of Civil and Environmental Engineering, Massachusetts Institute of Technology (MIT) - Department of Civil and Environmental Engineering, Erasmus University Rotterdam (EUR) - Department of Technology and Operations Management and Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM)
Downloads 45 (277,789)

Abstract:

3.

Disruption Management of Rolling Stock in Passenger Railway Transportation

ERIM Report Series Reference No. ERS-2009-046-LIS
Number of pages: 32 Posted: 26 Aug 2009
Gabor Maroti
Erasmus University Rotterdam (EUR) - Rotterdam School of Management (RSM)
Downloads 45 (314,043)

Abstract:

passenger railway transportation, disruptions, combinatorial decision problem