default author photo

Zhenqi Wang

affiliation not provided to SSRN

SCHOLARLY PAPERS

1

DOWNLOADS

35

TOTAL CITATIONS

0

Scholarly Papers (1)

1.

Feasibility Study on Implementing Operational Risk Assessment and Management with a Front-Controlled PRA in an AP1000 Nuclear Power Plant

Number of pages: 27 Posted: 06 Oct 2025
affiliation not provided to SSRN, Tsinghua University, affiliation not provided to SSRN, affiliation not provided to SSRN and affiliation not provided to SSRN
Downloads 35 (1,290,922)

Abstract:

Loading...

Probabilistic Risk Assessment (PRA), Front-Controlled, Risk metric, AP1000, Automatic Depressurization System Triggering Frequency (ADS-TF)