Abstract

On September 18th 2008, a replacement for the previously collapsed I-35W bridge opened to the public. Consequently, travelers were once again confronted with the opportunity to find better alternatives. The traffic pattern of the Minneapolis road network was likely to readjust, because of the new link addition. However, questions arise about the possible reasons (or components in the route choice process) that are likely to influence travelers crossing the Mississippi, who had to choose among the bridge options, includingthe new I-35W bridge. Using GPS data and web-based survey collected both before and after the replacement bridge opened, a bridge choice model is estimated using weighted-least squares logit. In this way the proportion of I-35W trips can be estimated depending on the assigned values of the explanatory variables, which include: statistical measures of the travel time distribution experienced by the subjects, alternative diversity, and others. The results showed that travel time savings and reliability were the main reasons for choosing the new I-35W bridge.

Keywords: 1-35W, civil engineering, transportation, Minneapolis

JEL Classification: R40, R41, O18

Suggested Citation

Carrion, Carlos and Levinson, David Matthew, Why Choose the New I-35W Mississippi River Bridge? (August 1, 2010). Available at SSRN: https://ssrn.com/abstract=1736203 or http://dx.doi.org/10.2139/ssrn.1736203

Carlos Carrion

affiliation not provided to SSRN ( email )

David Matthew Levinson (Contact Author)

affiliation not provided to SSRN

Here is the Coronavirus
related research on SSRN

Paper statistics

Downloads
16
Abstract Views
1,464
PlumX Metrics