The Temporal Dimension of Risk
27 Pages Posted: 13 Dec 2016
There are 2 versions of this paper
The Temporal Dimension of Risk
Date Written: December 12, 2016
Abstract
Multi-period measures of risk account for the path that the value of an investment portfolio takes. In the context of probabilistic risk measures, the focus has traditionally been on the magnitude of investment loss, and not on the dimension associated with the passage of time. In this paper, the concept of a temporal path-dependent risk measure is mathematically formalized in order to capture the risk associated with the temporal dimension of a stochastic process, and its theoretical properties are analyzed. We then study the temporal dimension of investment drawdown (its duration), which measures the length of excursions below a running maximum. Its properties in the context of risk measures are analyzed both theoretically and empirically. In particular, we show that duration captures serial correlation in the returns of two major asset classes. We conclude by discussing the challenges of path-dependent temporal risk estimation in practice.
Keywords: temporal risk, path-dependent risk, drawdown duration, maximum drawdown, serial correlation
Suggested Citation: Suggested Citation