Aproximación al Plan de Seguridad del Agua (PSA) del acueducto de la vereda El Tobal, municipio de Subachoque (Approach to the Water Safety Plan (WSP) for the Water Supply System of the Path 'El Tobal' Town of Subachoque)

8 Pages Posted: 1 Feb 2018

See all articles by Ángela María Jaramillo Londoño

Ángela María Jaramillo Londoño

University of Santo Tomas

Andrés Felipe Martínez Urrego

University of Santo Tomas - Faculty of Environmental Engineering

José Luis Díaz Arévalo

University of Santo Tomas

Date Written: November 30, 2017

Abstract

Spanish Abstract: Tal como lo establece la Organización Mundial de la Salud OMS, la forma más eficaz de garantizar sistemáticamente la seguridad de un sistema de abastecimiento de agua de consumo es aplicando un planteamiento integral de evaluación de los riesgos y gestión de los riesgos que abarque todas las etapas del sistema de abastecimiento, desde la cuenca de captación hasta su distribución al consumidor. En este sentido, en el presente trabajo se presentan tres estudios que permiten conocer el estado actual del funcionamiento del sistema. En el primero, se evalúa la calidad del agua de la fuente utilizando macroinvertebrados acuáticos como bioindicadores, para lo cual fue necesario la identificación taxonómica hasta nivel de familia de los individuos recolectados y la aplicación de índices biológicos BMWP/Col, ASPT, EPT, índice de dípteros y la aplicación de índices de diversidad como Shannon y Simpson para calcular la variedad de familias; se determinó que la quebrada El Salitre presenta aguas moderadamente contaminadas. En el segundo estudio, se realiza una evaluación de los riesgos potenciales sobre la calidad del agua de la fuente de abastecimiento del acueducto rural El Tobal, siguiendo un método semicuantitativo basado en matrices de riesgo [4]; se pudo determinar que los dos eventos peligrosos con mayor clasificación de riesgo fueron ganadería y agricultura, al ser los que mayor probabilidad de ocurrencia y efectos adversos sobre la salud humana tienen. En un tercer estudio se efectúa el plan de optimización operativo de la planta de tratamiento de agua, a partir de una metodología basada en análisis de demanda, condiciones hidráulicas, aspectos críticos de operación y mantenimiento, y análisis económico, donde se encontraron puntos clave del proceso como el aireador y el filtro, con los cuales se verificó un sobredimensionamiento de la planta y se evaluaron los principales cambios que requiere, finalmente se construyó el plan de optimización propuesto con el análisis económico, que en conjunto con la Asociación de Usuarios del Acueducto de la Vereda El Tobal se lleva a su posterior implementación.

English Abstract: As established by the World Health Organization WHO, the most effective way to systematically ensure the safety of a drinking water supply system is to apply a comprehensive approach to risk assessment and risk management covering all stages of the supply system, from catchment basin to distribution to the consumer. In this sense, the present work shows three studies that allow knowing the current state of the system operation. In the first one, the water quality of the source is evaluated using aquatic macroinvertebrates as bioindicators, for which it was necessary the taxonomic identification to family level of the individuals collected and the application of biological indexes BMWP / Col, ASPT, EPT, dipteran index and the application of diversity indices such as Shannon and Simpson to calculate the variety of families; it was determined that the El Salitre stream has moderately contaminated water. In the second study, an evaluation of the potential risks on the water quality of the supply source of the rural Tobal aqueduct was carried out, following a semi-quantitative method based on risk matrices; it was possible to determine that the two hazardous events with the highest risk classification were livestock and agriculture, since they are the ones with the highest probability of occurrence and adverse effects on human health. A third study carried out the operational optimization plan for the water treatment plant, based on a methodology based on demand analysis, hydraulic conditions, critical aspects of operation and maintenance, and economic analysis, where key such as the aerator and the filter, with which an over-dimensioning of the plant was verified and the main changes that were required were evaluated, finally the proposed optimization plan was constructed with the economic analysis, which together with the Association of Users of the Aqueduct of the El Tobal Path is carried out to its later implementation.

Note: Downloadable document is in Spanish.

Keywords: Water Safety Plan, Path “El Tobal”, Environmental Indicators

Suggested Citation

Jaramillo Londoño, Ángela María and Martínez Urrego, Andrés Felipe and Díaz Arévalo, José Luis, Aproximación al Plan de Seguridad del Agua (PSA) del acueducto de la vereda El Tobal, municipio de Subachoque (Approach to the Water Safety Plan (WSP) for the Water Supply System of the Path 'El Tobal' Town of Subachoque) (November 30, 2017). Ibero-American Seminar on Water and Drainage Networks (SEREA 2017), Available at SSRN: https://ssrn.com/abstract=3108183 or http://dx.doi.org/10.2139/ssrn.3108183

Ángela María Jaramillo Londoño

University of Santo Tomas ( email )

Carrera 9 calle 73
España Manila, CO Bogota 1015
Philippines

Andrés Felipe Martínez Urrego

University of Santo Tomas - Faculty of Environmental Engineering ( email )

Sede Principal, Carrera 9 N.° 51-11
Bogotá
Colombia

José Luis Díaz Arévalo (Contact Author)

University of Santo Tomas ( email )

Carrera 9 calle 73
España Manila, CO Bogota 1015
Philippines

Do you have a job opening that you would like to promote on SSRN?

Paper statistics

Downloads
35
Abstract Views
381
PlumX Metrics