CLEANKER – Clean Clinker by Calcium Looping Process for Low-CO2 Cement Production

6 Pages Posted: 4 Apr 2019 Last revised: 27 Oct 2020

See all articles by Martina Fantini

Martina Fantini

Laboratory of Energy and Environment Piacenza - LEAP s.c.a r.l.

Maurizio Spinelli

Polytechnic University of Milan

Manuele Gatti

Polytechnic University of Milan; LEAP (Laboratorio Energia e Ambiente Piacenza)

Matteo Carmelo Romano

Polytechnic University of Milan - Department of Energy

Stefano Campanari

Polytechnic University of Milan

Stefano Consonni

University of Adelaide

Mario Balocco

Buzzi Unicem

Fulvio Canonico

Buzzi Unicem

Carlos Abanades

Spanish Research Council CSIC-INCAR

Borja Arias

Spanish Research Council CSIC-INCAR

Jörg Hammerich

Ingenieurbüro-Kühlerbau-Neustadt (IKN) GmbH

Kari Myöhänen

Lappeenranta University of Technology (LUT)

Filippo Sessa

Quantis

Alla Shogenova

Tallinn University of Technology, Department of Geology

Li Zhenshan

Tsinghua University

Reinhold Spörl

University of Stuttgart - Institute of Combustion and Power Plant Technology (IFK)

Volker Hoenig

VDZ

Donovan Baldassarri

Associazione Amici della Terra

Giovanni Cinti

C.T.G SpA

Abstract

The CLEANKER project got EC support from October 2017 to September 2021 under the Horizon 2020 call LCE 29 – 2017 . CLEANKER (www.cleanker.eu) aims at demonstrating at TRL7 the Calcium Looping (CaL) concept in a configuration highly integrated with the cement production process, making use of entrained flow reactors.

The cement industry is a key-sector for the reduction of CO2 emissions. CO2 generation in cement production processes in fact, cannot be disregarded due to the calcination of limestone (CaCO3 dissociated to CaO and CO2), the most important raw material. Around 60% of the direct CO2 emissions from the clinker burning process are due to this reaction. In addition, there are the emissions from combustion of mostly fossil fuels, as well as the generation of electric power required by the process (e.g. grinding), as indirect CO2 emissions. Cement production is thus responsible for about 27% of global anthropogenic CO2 emissions from industrial sources worldwide and for 5% of anthropogenic global CO2 emissions . According to IEA and ZEP studies, cement industry should contribute to the largest CO2 emission reduction through CCS in Europe, in order to meet the target of 2°C of global temperature increase (IEA 2DS scenario).

There are currently no feasible methods to produce clinker, and thus cement, without releasing CO2 from CaCO3, and, given the lifetime of a cement plant (30-50 years), the technologies to be developed have to be retrofittable. In addition to oxyfuel combustion and post-combustion solvent-based capture technologies, which have attracted most of the research efforts up to now, Calcium Looping is recognized as another very promising emerging technology for CO2 capture in cement plants. Calcium looping (or carbonate looping) is a regenerative process, which takes advantage of the capacity of calcium oxide-based sorbents to capture CO2 at high temperatures. The process is divided in two basic steps: (1) the capture of CO2 by “carbonation” of CaO to form CaCO3 in a reactor operating around 650°C; and (2) oxyfuel calcination in a reactor operating above 900-920°C, which makes the CaO available again and releases a gas stream of nearly pure CO2.

The highly integrated Calcium Looping process configuration allows achieving high-energy efficiency, with CO2 capture efficiency target over 90%. The overall energy consumption can be kept low by proper integration with raw meal preheating and heat recovery from the kiln flue gases. The adoption of entrained flow gas-solid reactors is particularly suitable for this Calcium Looping configuration, because in such reactors, the same very fine raw material can be used for clinker production (CaO) and for CO2 sorption without additional milling requirements. Moreover, entrained flow reactors are already commonly used in cement plants.

The core activity of the project is the design, construction and operation of a CaL demonstration system including the entrained-flow carbonator (the CO2 absorber) and the entrained-flow oxyfuel calciner (the sorbent regenerator). This demonstration system, connected to the Buzzi Unicem kiln of the Vernasca cement plant (Italy), will capture the CO2 from a portion of the flue gases of the kiln, using as CO2 sorbent the same raw meal that is used for clinker production. Other activities will include: (i) screening of different raw meals to assess their properties as CO2 sorbent, (ii) reactors and process modelling, (iii) scale-up study, (iv) economic analysis, (v) life cycle assessment, (vi) CO2 transport, storage and utilization study, (vii) demonstration of the complete value chain, including mineral carbonation of waste ash with the CO2 captured in the pilot system, (viii) exploitation study for the demonstration of the technology at TRL>7 and for its first commercial exploitation based on CO2 transport and storage opportunities.

It integrates the research of 13 organizations:
• Representatives from the academia: Politecnico di Milano (Italy), Tallinn University of Technology (Estonia), Lappeenranta University of Technology (Finland); University of Stuttgart (Germany) and Tsinghua University (China);
• Research centres: LEAP (Italy), CSIC (Spain) and VDZ (Germany);
• SME: Quantis (Switzerland);
• Technology provider: IKN (Germany);
• End users: Buzzi Unicem and Italcementi – Heidelberg Group (Italy);
• Environmental organization: Amici della Terra (Italy).
Thus including all the necessary expertise and access to the industrial facilities to reach the ambitious aim of the project.
The project is coordinated by LEAP.

Acknowledgements:
This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 764816. This work is supported by the China Government (National Natural Science Foundation of China) under contract No. 91434124 and No. 51376105.

Disclaimer: The European Commission support for the production of this publication does not constitute endorsement of the contents which reflects the views only of the authors, and the Commission cannot be held responsible for any use which may be made of the information contained therein.

Keywords: Cement, GHGT-14, calcium looping, CCS, CO2 capture

Suggested Citation

Fantini, Martina and Spinelli, Maurizio and Gatti, Manuele and Romano, Matteo Carmelo and Campanari, Stefano and Consonni, Stefano and Balocco, Mario and Canonico, Fulvio and Abanades, Carlos and Arias, Borja and Hammerich, Jörg and Myöhänen, Kari and Sessa, Filippo and Shogenova, Alla and Zhenshan, Li and Spörl, Reinhold and Hoenig, Volker and Baldassarri, Donovan and Cinti, Giovanni, CLEANKER – Clean Clinker by Calcium Looping Process for Low-CO2 Cement Production. 14th Greenhouse Gas Control Technologies Conference Melbourne 21-26 October 2018 (GHGT-14) , Available at SSRN: https://ssrn.com/abstract=3366108 or http://dx.doi.org/10.2139/ssrn.3366108

Martina Fantini (Contact Author)

Laboratory of Energy and Environment Piacenza - LEAP s.c.a r.l. ( email )

Via Nino Bixio 27/C
Piacenza, Piacenza 29121
Italy

Maurizio Spinelli

Polytechnic University of Milan

Piazza Leonardo da Vinci
Milan, Milano 20100
Italy

Manuele Gatti

Polytechnic University of Milan

Via Lambruschini 4
Milano, Milano 20133
Italy

LEAP (Laboratorio Energia e Ambiente Piacenza) ( email )

via Nino Bixio 27/C
Piacenza, 29121
Italy

Matteo Carmelo Romano

Polytechnic University of Milan - Department of Energy ( email )

via Lambruschini 4
Milan, 20156
Italy

Stefano Campanari

Polytechnic University of Milan

Piazza Leonardo da Vinci
Milan, Milano 20100
Italy

Stefano Consonni

University of Adelaide

Mario Balocco

Buzzi Unicem

15033 Casale Monferrato
Alessandria
Italy

Fulvio Canonico

Buzzi Unicem

15033 Casale Monferrato
Alessandria
Italy

Carlos Abanades

Spanish Research Council CSIC-INCAR

Francisco Pintado Fe 26
Oviedo, 33011
Spain

Borja Arias

Spanish Research Council CSIC-INCAR

Francisco Pintado Fe 26
Oviedo, 33011
Spain

Jörg Hammerich

Ingenieurbüro-Kühlerbau-Neustadt (IKN) GmbH

Herzog-Erich-Allee 1
Neustadt, 31535
Germany

Kari Myöhänen

Lappeenranta University of Technology (LUT)

Lappeenranta
Finland

Filippo Sessa

Quantis ( email )

Switzerland

Alla Shogenova

Tallinn University of Technology, Department of Geology ( email )

Ehitajate tee 5
Tallinn, 19086
Estonia
+372 56644668 (Phone)

Li Zhenshan

Tsinghua University

Beijing, 100084
China

Reinhold Spörl

University of Stuttgart - Institute of Combustion and Power Plant Technology (IFK)

Pfaffenwaldring 23
Stuttgart, 70569
Germany

Volker Hoenig

VDZ

Dusseldorf
Germany

Donovan Baldassarri

Associazione Amici della Terra

via Ippolito Nievo 62
Roma, 00153
Italy

Giovanni Cinti

C.T.G SpA

Italy

Do you have a job opening that you would like to promote on SSRN?

Paper statistics

Downloads
65
Abstract Views
581
rank
413,960
PlumX Metrics