Integrated Project Delivery Using System Dynamics

33rd International Conference of the System Dynamics Society, Cambridge, Massachusetts, USA, July 19-23, 2015

20 Pages Posted: 3 Jun 2019

See all articles by Eddy Susanto

Eddy Susanto

affiliation not provided to SSRN

Lukas B. Sihombing

University of Indonesia (UI) - Faculty of Economic, University of Indonesia (UI) - Department of Civil Engineering

Date Written: July 19, 2015

Abstract

The construction industry is a growth engine to improve economic growth, but most project construction delivery is usually in a linear process. Each process depends on previous work because of their interdependence. This paper strives to compare traditional project delivery and integrated project delivery using a system dynamics method based on a design-bid-build process for construction. The results of this research endeavor to prove that integrated project delivery is more effective than traditional project delivery.

Keywords: construction industry, traditional project delivery, integrated project delivery

JEL Classification: G23, R41, R51

Suggested Citation

Susanto, Eddy and Sihombing, Lukas B., Integrated Project Delivery Using System Dynamics (July 19, 2015). 33rd International Conference of the System Dynamics Society, Cambridge, Massachusetts, USA, July 19-23, 2015, Available at SSRN: https://ssrn.com/abstract=3386163

Eddy Susanto

affiliation not provided to SSRN

Lukas B. Sihombing (Contact Author)

University of Indonesia (UI) - Faculty of Economic, University of Indonesia (UI) - Department of Civil Engineering ( email )

Kampus Baru
Depok, West Java 16424
Indonesia

Do you have a job opening that you would like to promote on SSRN?

Paper statistics

Downloads
13
Abstract Views
175
PlumX Metrics