Towards Sustainable Water Supply: Enhancing Project Accountability Practices in Water Supply Projects Within Nairobi City County’s Informal Settlement Areas

Journal of Economics and Business, Vol.2 No.3 (2019)

11 Pages Posted: 6 Aug 2019

See all articles by Wanjiru R. Gichohi

Wanjiru R. Gichohi

Kenyatta University

Paul Sang

Kenyatta University

George Kosimbei

Kenyatta University

Date Written: August 01, 2019

Abstract

Sustainability of water supply has over the years become a key concern for the global community due to water stress and scarcity attributable to climate change and other anthropogenic factors. This is especially crucial for urban areas where increased rural-urban migration has brought population increases, thus raising the demand for basic services and infrastructure. The concerted efforts of water sector stakeholders have seen to, among other strategies, the implementation of water supply projects in affected areas. In Kenya, however, the statistics show that these water supply projects have reported high failure rates with the existing systems failing to operate at full capacity. The study sought to investigate the effect on the effect of accountability on the sustainability of water supply projects in Nairobi City County's informal settlement areas. A sample of 260 project leaders of water supply projects was considered in this study. Data was collected using structured questionnaires, and both descriptive and inferential data analysis was conducted. The findings revealed that accountability has a positive and statistically significant effect on sustainability and that strengthening accountability practices such as monitoring and evaluation, managerial evaluation, and transparency would bolster project sustainability.

Keywords: Project Sustainability, Accountability, Project Evaluation, Managerial Assessment, Transparency

Suggested Citation

Gichohi, Wanjiru R. and Sang, Paul and Kosimbei, George, Towards Sustainable Water Supply: Enhancing Project Accountability Practices in Water Supply Projects Within Nairobi City County’s Informal Settlement Areas (August 01, 2019). Journal of Economics and Business, Vol.2 No.3 (2019), Available at SSRN: https://ssrn.com/abstract=3429474

Wanjiru R. Gichohi (Contact Author)

Kenyatta University ( email )

P.O. Box 43844
Nairobi, Nairobi 00100
Kenya

Paul Sang

Kenyatta University ( email )

P.O. Box 43844
Nairobi, Nairobi 00100
Kenya

George Kosimbei

Kenyatta University ( email )

P.O. Box 43844
Nairobi, Nairobi 00100
Kenya

Do you have a job opening that you would like to promote on SSRN?

Paper statistics

Downloads
49
Abstract Views
293
PlumX Metrics