Calcium Looping Technology Demonstration in Industrial Environment: Status of the CLEANKER Pilot Plant

10 Pages Posted: 2 Apr 2021

See all articles by Martina Fantini

Martina Fantini

Laboratory of Energy and Environment Piacenza - LEAP s.c.a r.l.

Mario Balocco

Buzzi Unicem

Luigi Buzzi

Buzzi Unicem

Fulvio Canonico

Buzzi Unicem

Stefano Consonni

University of Adelaide

Riccardo Cremona

affiliation not provided to SSRN

Manuele Gatti

Polytechnic University of Milan; LEAP (Laboratorio Energia e Ambiente Piacenza)

Jörg Hammerich

Ingenieurbüro-Kühlerbau-Neustadt (IKN) GmbH

Reinhard Koehler

Ingenieurbüro-Kühlerbau-Neustadt (IKN) GmbH

Francesco Magli

Polytechnic University of Milan - Department of Energy

Matteo Carmelo Romano

Polytechnic University of Milan - Department of Energy

Maurizio Spinelli

Polytechnic University of Milan

Date Written: April 1, 2021

Abstract

Calcium Looping (CaL) is recognized as one of the most promising emerging technology for CO2 capture in cement plants. The highly integrated Calcium Looping process configuration enables CO2 capture with an efficiency target over 90% and high-energy efficiency.

The core activity of the CLEANKER project is the design, construction and operation of a CaL demonstration system including the entrained-flow carbonator (the CO2 absorber) and the entrained-flow oxyfuel calciner (the sorbent regenerator). This demonstration system, connected to the Buzzi Unicem kiln of the Vernasca cement plant (Italy), will capture the CO2 from a portion of the flue gases of the kiln, using as CO2 sorbent the same raw meal that is used for clinker production.

The CLEANKER implementation plan spans four years and half, from October 2017 to March 2022 (an extension of six months has been requested due to the pandemic situation). The first two years have been devoted to the (i) detailed design of the CaL demonstration system, the (ii) characterization of raw meals as CO2 sorbents and the (iii) erection of the demonstrator.

The pilot plant has been commissioned in October 2020 and then will be demonstrated by means of several short and long steady-state tests (during spring and summer 2021), with the aim of optimizing the operational parameters governing the CO2 capture process and of bringing the integrated CaL technology at TRL7. The pilot plant and the conventional kiln operations will be deeply integrated: the CaL calciner will be fed by the same kind of raw meal used in the kiln for producing clinker, whereas the carbonator will treat the effluents coming from the cement plant. The CaL calciner will be fired in a recirculated oxy-fuel combustion mode, where a heavy fuel oil will be burnt with oxygen and a fraction of the CO2-rich exhausts will be recirculated to control the oxidant composition. Before being recycled to the CaL calciner inlet, this CO2-rich stream will be properly cooled in a regenerative riser-cyclone stage, designed to preheat the fresh raw meal-based sorbent fed to the pilot, minimizing the additional fuel supplied to run the calcium looping process. In the carbonator, the amount of sorbent (FCa/FCO2) will be tuned either by increasing the raw meal exchanged with the CaL calciner or by internally recycling a fraction of sorbent from the carbonator outlet to the inlet. First short campaigns will be carried out by specialized Buzzi Unicem operators (assisted by CLEANKER partners such as, Politecnico di Milano, Laboratorio Energia e Ambiente Piacenza, IKN, University of Stuttgart and VDZ) to test the process performances as a function of the type of raw meal, the amount of sorbent (solid to gas ratio in the carbonator) and the carbonation/calcination operating temperatures.

The experimental activity will prove the stability and the effectiveness of the process by running over hundreds of hours the optimal experimental configuration, capable of achieving a constant carbon capture rate higher than 90%. Besides the continuous monitoring of process temperatures, flow rates and gas compositions, the experimental campaigns will be supported by post-processing sorbent analysis, in order to evaluate the capture capacity of the raw meal and the extent of side reactions. Test results will be exploited to validate simulation models and to improve the future scale-up and the design of an industrial size CaL plant.

Keywords: CLEANKER; CCUS; CO2 capture; Calcium Looping; Cement; Clinker; Entrained Flow Reactors

Suggested Citation

Fantini, Martina and Balocco, Mario and Buzzi, Luigi and Canonico, Fulvio and Consonni, Stefano and Cremona, Riccardo and Gatti, Manuele and Hammerich, Jörg and Koehler, Reinhard and Magli, Francesco and Romano, Matteo Carmelo and Spinelli, Maurizio, Calcium Looping Technology Demonstration in Industrial Environment: Status of the CLEANKER Pilot Plant (April 1, 2021). Proceedings of the 15th Greenhouse Gas Control Technologies Conference 15-18 March 2021, Available at SSRN: https://ssrn.com/abstract=3817346 or http://dx.doi.org/10.2139/ssrn.3817346

Martina Fantini (Contact Author)

Laboratory of Energy and Environment Piacenza - LEAP s.c.a r.l. ( email )

Via Nino Bixio 27/C
Piacenza, Piacenza 29121
Italy

Mario Balocco

Buzzi Unicem

15033 Casale Monferrato
Alessandria
Italy

Luigi Buzzi

Buzzi Unicem ( email )

15033 Casale Monferrato
Alessandria
Italy

Fulvio Canonico

Buzzi Unicem

15033 Casale Monferrato
Alessandria
Italy

Stefano Consonni

University of Adelaide

Riccardo Cremona

affiliation not provided to SSRN

Manuele Gatti

Polytechnic University of Milan

Via Lambruschini 4
Milano, Milano 20133
Italy

LEAP (Laboratorio Energia e Ambiente Piacenza) ( email )

via Nino Bixio 27/C
Piacenza, 29121
Italy

Jörg Hammerich

Ingenieurbüro-Kühlerbau-Neustadt (IKN) GmbH

Herzog-Erich-Allee 1
Neustadt, 31535
Germany

Reinhard Koehler

Ingenieurbüro-Kühlerbau-Neustadt (IKN) GmbH ( email )

Herzog-Erich-Allee 1
Neustadt, 31535
Germany

Francesco Magli

Polytechnic University of Milan - Department of Energy ( email )

via Lambruschini 4
Milan, 20156
Italy

Matteo Carmelo Romano

Polytechnic University of Milan - Department of Energy ( email )

via Lambruschini 4
Milan, 20156
Italy

Maurizio Spinelli

Polytechnic University of Milan

Piazza Leonardo da Vinci
Milan, Milano 20100
Italy

Do you have a job opening that you would like to promote on SSRN?

Paper statistics

Downloads
18
Abstract Views
97
PlumX Metrics