Mostafa Khatami

University of Technology Sydney (UTS)

15 Broadway, Ultimo

PO Box 123

Sydney, NSW 2007

Australia

SCHOLARLY PAPERS

5

DOWNLOADS

104

SSRN CITATIONS

2

CROSSREF CITATIONS

1

Scholarly Papers (5)

1.

Coupled Task Scheduling With Exact Delays: Literature Review and Models

Number of pages: 35 Posted: 04 Mar 2019
Mostafa Khatami, Amir Salehipour and T.C.E. Cheng
University of Technology Sydney (UTS), affiliation not provided to SSRN and Hong Kong Polytechnic University - Faculty of Business
Downloads 42 (432,224)
Citation 3

Abstract:

Loading...

scheduling, coupled task, review, single machine, shop setting, benchmark instances, mathematical model

2.

Coupled Task Scheduling with Time-Dependent Processing Times

Number of pages: 16 Posted: 14 Jan 2019 Last Revised: 09 Jun 2019
Mostafa Khatami and Amir Salehipour
University of Technology Sydney (UTS) and affiliation not provided to SSRN
Downloads 23 (523,300)

Abstract:

Loading...

single machine coupled task scheduling, time-dependent processing time, simple linear processing time, dynamic program, heuristic

3.

A Binary Search Method for the General Coupled Task Scheduling Problem

Number of pages: 13 Posted: 19 Sep 2019
Mostafa Khatami and Amir Salehipour
University of Technology Sydney (UTS) and affiliation not provided to SSRN
Downloads 22 (529,277)

Abstract:

Loading...

coupled task scheduling, single machine, minimizing makespan, binary search, heuristic, bounds

4.

The Gradual Minimal Covering Location Problem

Number of pages: 16 Posted: 14 Feb 2020
Mostafa Khatami and Amir Salehipour
University of Technology Sydney (UTS) and affiliation not provided to SSRN
Downloads 13 (584,870)

Abstract:

Loading...

minimal coverage, gradual covering, undesirable facility, facility location, distance constraint

5.

Optimal Makespan for the Coupled Task Ordered Flow-Shop

Number of pages: 12 Posted: 19 Feb 2020
Mostafa Khatami and Amir Salehipour
University of Technology Sydney (UTS) and affiliation not provided to SSRN
Downloads 4 (645,501)

Abstract:

Loading...

ordered flow-shop, coupled task, exact delays, pyramidal property, makespan