default author photo

Nengmin Wang

affiliation not provided to SSRN

SCHOLARLY PAPERS

7

DOWNLOADS

509

TOTAL CITATIONS

0

Scholarly Papers (7)

1.

Within-Brand or Cross-Brand: The Trade-In Option Under Consumer Switching Costs

Number of pages: 58 Posted: 09 Apr 2022
Rong Dong, Nengmin Wang, Bin Jiang and Qidong He
affiliation not provided to SSRN, affiliation not provided to SSRN, DePaul University and Southwest Jiaotong University
Downloads 122 (600,462)

Abstract:

Loading...

trade-in strategy, consumer switching costs, competition, Closed-loop supply chain, cross-brand exchange

2.

Perceived Algorithmic Power Questionnaire (Papq): Scale Development and its Impact Mechanism on Job Well-Being of Gig Workers

Number of pages: 40 Posted: 19 Jan 2025
Yan Bao, Liu Z, Nengmin Wang, Jie Gao and ShanXing Gao
affiliation not provided to SSRN, Independent, affiliation not provided to SSRN, Xi'an Jiaotong University (XJTU) and Xi'an Jiaotong University (XJTU)
Downloads 107 (664,543)

Abstract:

Loading...

Perceived Algorithm Power, Job Well-Being, Autonomy Needs, Algorithmic Transparency, App-based Gig Work

3.

Routing Optimization for Medical Waste Collection Considering Infectious Risk and Multiple Disposal Centers

Number of pages: 70 Posted: 17 May 2023
Nengmin Wang, Wei Cui, Meng Zhang and Qi Jiang
affiliation not provided to SSRN, affiliation not provided to SSRN, affiliation not provided to SSRN and affiliation not provided to SSRN
Downloads 105 (679,608)

Abstract:

Loading...

medical waste collection, routing optimization, infectious risk, multiple disposal centers, ε-constraint method

4.

A Branch-and-Bound Algorithm for the Proactive Resource-Constrained Project Scheduling Problem with Robustness Maximization Objective

Number of pages: 30 Posted: 12 Mar 2023
Xue Li, Zheng He and Nengmin Wang
affiliation not provided to SSRN, affiliation not provided to SSRN and affiliation not provided to SSRN
Downloads 93 (730,864)

Abstract:

Loading...

project scheduling, optimization model, branch-and-bound algorithm, robustness, resource constraint

5.

An Integrated Pro-Reactive Procedure for Resource-Constrained Project Scheduling with Decreasing Duration Variability

Number of pages: 87 Posted: 06 May 2025
affiliation not provided to SSRN, affiliation not provided to SSRN, Ghent University, Ghent University and affiliation not provided to SSRN
Downloads 36 (1,277,121)

Abstract:

Loading...

Pro-reactive scheduling, descending variability, HGNSGA, reactive strategy

6.

A Multi-Round Combinatorial Double Auction for Carrier Collaboration with Carbon Emission Permits Trading in Less than Truckload Transportation

Number of pages: 48 Posted: 17 Apr 2024
Soochow University, University of Technology of Troyes, affiliation not provided to SSRN and Soochow University
Downloads 35 (1,263,436)

Abstract:

Loading...

Carrier collaboration, combinatorial double auction, carbon emission permits trading, less than truckload transportation

7.

Proactive multi-skilled resource-constrained project scheduling with fixed skill assignment

Number of pages: 45 Posted: 13 May 2026
Yong Ma, Shuang Zheng, Zheng He and Nengmin Wang
affiliation not provided to SSRN, Northwestern Polytechnical University, affiliation not provided to SSRN and affiliation not provided to SSRN
Downloads 11 (1,566,597)

Abstract:

Loading...

Proactive project scheduling, Multi-skilled resources, Schedule robustness, Skill assignment, Tabu search